BTT×EDUOS — ADDITIONAL MATHEMATICS A1 IMPLEMENTATION NODE

BukitTimahTutor as EDUOS→ADDMATHOS Intervention Router (Code-Only v0.1)


0) METADATA

NODE.ID: BTT-EDUOS-ADDMATH-A1-00
NODE.TYPE: place_implementation_intervention
PLACE.ID: SG-SGP-BUKITTIMAH
ORG.ID: BTT (BukitTimahTutor)
PARENT.OS: EDUOS
SUBOS: ADDMATHOS
IMPL: tuition_intervention_router
PURPOSE: route_students_to_P3_A1_reliability_in_additional_mathematics_under_exam_constraints
VERSION: v0.1

1) IMPLEMENTATION DEFINITION LOCK

DEF.BTT_ADD_MATH_IMPL:
BukitTimahTutor implements the Education OS AddMath intervention router by
diagnosing failure modes, enforcing the A0 algebra integrity gate, and running
repair+upgrade protocols to produce P3-stable modelling execution (A1 grade reliability)
under Singapore upper-secondary exam conditions.

2) ROOT ANCHORS (SYSTEM STITCHING UPWARD)

BIND.UP.1: EDUOS-00 (Education OS pillar)
BIND.UP.2: EDUOS-02 (Education as anti-decay)
BIND.UP.3: ADDMATHOS-00 (AddMath supply lane)
BIND.UP.4: EDUOS-ADDMATHOS-ROUTER-00 (AddMath router canonical)
BIND.SIDE.1: MATHOS-00 (A0 algebra integrity gate)
BIND.SIDE.2: LANGOS-00 (word/definition translation dependency)
BIND.SIDE.3: SCIOS-00 (downstream modelling dependency)
BIND.SIDE.4: EDUOSxBIOOS-01 (bio constraints: fatigue/stress/consolidation)
BIND.IMPL.1: EDUOS-IMPL-02 (tuition as intervention router)

3) TARGET OUTCOME (WHAT “A1” MEANS IN OS TERMS)

TARGET.GRADE.A1 := P3 reliability under full-paper constraints
TARGET.PHASE := P3
TARGET.SENSORS:
- algebra_leak_rate_under_pressure -> near_zero
- structure_recognition_latency -> low
- mixed_modelling_transfer_rate -> high
- variance_across_papers -> low
- checking_microcheck_frequency -> stable_under_time

Rule:

A1 is a reliability state, not a topic coverage claim.

4) INTAKE CLASSIFICATION (MINIMUM VIABLE)

CLASSIFY.IN:
- PHASE: P0|P1|P2|P3
- FAIL: A1..A9 (from EDUOS-ADDMATHOS-ROUTER-00)
- TIME: exam_date_distance (weeks)
- LOAD: fatigue/stress proxy
- PRIOR: current algebra integrity baseline

5) ROUTING TRACKS (BTT IMPLEMENTATION)

Three-track router (matches your tuition messaging logic):

Track R-Collapse (P0)

TRACK.ID: BTT-ADD-R0
ENTRY: P0 or severe avoidance
GOAL: re_entry + minimum viable chain execution
METHOD:
- A0 integrity rebuild
- confidence re-entry loops
- low threat, high feedback
EXIT: P1 stable participation

Track R-Unstable (P1/P2)

TRACK.ID: BTT-ADD-R1
ENTRY: P1 or leaky P2
GOAL: seal leaks + raise transfer reliability
METHOD:
- enforce A0 gate
- structure recognition
- transformation templates
- mixed transfer ladders
EXIT: P2/P3 stability

Track R-Mastery (P3)

TRACK.ID: BTT-ADD-R2
ENTRY: P3 but wants A1 consistency
GOAL: slip elimination + twist dominance + paper stability
METHOD:
- timed mixed papers
- microcheck survival under time
- sinkhole escape protocol
EXIT: low variance A1 reliability

6) A0 GATE ENFORCEMENT (NON-NEGOTIABLE)

GATE.A0.ENFORCE:
if algebra_leak_rate > threshold:
- pause advanced topic pushing
- run integrity firewall first
- re-test under time pressure

A0 firewall includes:

- sign tracking
- term conservation check
- substitution sanity
- identity anchoring
- checkpoint protocol at high-risk steps

7) PROTOCOL LIBRARY (BTT ROUTER TOOLKIT)

PROTO.BTT.ADD.1: integrity_firewall (A0)
PROTO.BTT.ADD.2: structure_cue_cards (fast classification)
PROTO.BTT.ADD.3: function_system_protocol (compose/inverse/domain-range)
PROTO.BTT.ADD.4: identity_template_library (logs/indices/trig)
PROTO.BTT.ADD.5: modelling_translation_protocol (vars/units/constraints)
PROTO.BTT.ADD.6: mixed_transfer_ladders (interleaving + variation)
PROTO.BTT.ADD.7: verification_microchecks (proof-like habits)
PROTO.BTT.ADD.8: timed_chain_endurance (full-paper stamina)
PROTO.BTT.ADD.9: spaced_retrieval_lock (BIOOS scheduling)
PROTO.BTT.ADD.10: panic_recovery_script (re-entry mid-paper)

8) SENSORS + DECISION RULES (WHEN TO SWITCH TRACKS)

SENSOR.SET:
S1 algebra_leak_rate_under_pressure
S2 structure_recognition_latency
S3 transformation_accuracy
S4 mixed_transfer_rate
S5 microcheck_frequency_under_time
S6 paper_variance
S7 retention_7d_14d

Decision rules:

IF S1 high -> route to A0 firewall
IF S4 low but S3 ok -> increase variation wrappers (transfer training)
IF S6 high -> paper routing + endurance blocks
IF S5 drops under time -> minimum viable checking protocol training

9) POSITIONING (ANTI-CANNIBALISATION)

POSITIONING:
- not "more practice"
- not "chapter coverage"
- "high-coupling reliability engineering for Add Math"
- "A0 gate + structure recognition + transfer under exam time"
SEO-LANE:
education_os_intervention_router
modelling_reliability
leak_sealing
phase_stability

10) INTERNAL LINK SLOTS (FOR YOUR SITE GRAPH)

LINK.OUT.1: EDUOS-ADDMATHOS-ROUTER-00 (canonical router on eduKateSG)
LINK.OUT.2: ADDMATHOS-00 (supply lane definition)
LINK.OUT.3: MATHOS-00 (A0 gate)
LINK.OUT.4: EDUOSxBIOOS-01 (fatigue/stress)
LINK.OUT.5: EDUOS-IMPL-02 (tuition router spec)
LINK.OUT.6: BTT-EDUOS-MATHOS-SEC-00 (secondary math router impl, optional next)

11) LOCK

LOCK:
BukitTimahTutor implements AddMath success as reliability engineering:
enforce the A0 algebra integrity gate, build structure recognition, train mixed
modelling transfer, and lock P3 stability under full-paper time pressure to reach A1.

Start Here:

BukitTimahTutor Lattice Graph Block

Z0 Execution:
BTT.MAT.Z0.P.ALG.001
BTT.MAT.Z0.P.DIF.001
BTT.SEN.Z0.S.TTC.001
BTT.MAT.Z0.S.ERR.001

Z1 Support Loops:
BTT.PAR.Z1.P.HOM.001
BTT.TUI.Z1.P.SCF.001
BTT.SEN.Z1.S.DEP.001
BTT.SEN.Z1.S.FCG.001

Z2 Exam/Transition:
BTT.EXM.Z2.P.SEC.001
BTT.EDU.Z2.P.TRN.001
BTT.EXM.Z2.B.OLEV.001

Z3 Interfaces:
SG.EDU.Z3.B.SYL.001
SG.EDU.Z3.B.EXM.001
SG.EDU.Z3.B.PLC.001

Edges:
BTT.TUI.Z1.P.SCF.001 BindsTo BTT.MAT.Z0.P.ALG.001
BTT.MAT.Z0.P.ALG.001 BindsTo BTT.EXM.Z2.P.SEC.001
BTT.EDU.Z2.P.TRN.001 Impacts BTT.EXM.Z2.B.OLEV.001
BTT.SEN.Z1.S.DEP.001 Impacts BTT.EXM.Z2.P.SEC.001
BTT.SEN.Z0.S.TTC.001 Observes BTT.EXM.Z2.P.SEC.001